I integrated and refurbished a second‑hand film developer, which required extensive lab adaptations. The building’s water supply was insufficient, so I designed and installed a cold‑water recovery system that redirected cooling water as wash water, cutting consumption by ~10 L/min. The project blended PVC glueing, sustainability and industrial refurbishment.
Integrating a Film Developing Machine